Çevre Yönetimi

Gemini_Generated_Image_vhxn3zvhxn3zvhxn

Environmental Management and Technical Support Services

As Yalova Machinery Specialized OIZ, we manage the full spectrum of our industrialists’ environmental responsibilities within a professional ecosystem, from the initial investment phase through to operational stages. Our Environment, Climate Change, and Sustainability Department does more than just track legislation; it serves as a technical guide for your facility at every step, from infrastructure to licensing.

Our Service Areas and Operational Support

  • Zero Waste Management System: We provide full support in the establishment and effective operation of Zero Waste systems within your facilities in compliance with current regulations.

  • Infrastructure Audit and Treatment: Before your production facilities are commissioned, we audit water and wastewater infrastructure for compliance; we meticulously manage regional wastewater through the operation of our modern treatment plant.

  • Wastewater Connection Permits: We organize the necessary connection permit processes for the integration of facilities into the regional sewage and discharge systems.

  • Green Building Coordination: In line with our sustainable industry goals, we manage Green Building processes and ensure the necessary coordination in cooperation with the Turkish Standards Institution (TSE).

  • EIA (Environmental Impact Assessment) Process Management: We analyze the EIA compliance of your investments and coordinate the relevant application processes.

  • Environmental Licensing Consultancy: By conducting comprehensive evaluations regarding your environmental permit processes, we guide your business toward the most accurate and efficient steps.

  • Business Opening and Operation Permits: We conclude the licensing procedures required for your business to legally commence operations within our department.

  • Leasing Procedures (Regulatory Compliance): Leasing processes within the zone are carried out meticulously within the framework of Article 63 of the OIZ Implementation Regulation. In this context, all legal business and transactions are coordinated before and after the leasing process.

Dosyalar

EIA COMPLIANCE, SITE SELECTION, AND FACILITY ESTABLISHMENT APPLICATION DOCUMENTS (CONSTRUCTION PHASE)
TRIAL PERMIT AND BUSINESS OPENING AND OPERATION LICENSE APPLICATION DOCUMENTS
WASTEWATER CONNECTION PERMIT APPLICATION DOCUMENTS